Basic Info.
Packaging & Delivery
Product Description
Specifications
CNC slitting folding machine
1.Max.bending length:4,6,8m
2.Throat Depth:1000mm
3.Max.bending angle:125degree
CNC slitting folding machine
Types | Function | Payment term | Other function |
4m/6m/8.2m | Can fold steel panel into any obtuse angles | 30% deposit required | shearing &slitting |
General Parameter
1)For Steel sheet; Aluminum; Stainless steel
2)Thickness: Max.1.0mm
3)Feeding width: Max. 1000mm
4)Driven by Servo motor, pump motor: 0.82KW
5)Working length: 4000mm, 6000mm, 8000mm
6)Press clamp:5 units,7 units, 9 units
7)Weight:Approx. 3000 Kg
8)Pressing power:pump motor for hydraulic station7.5KW(Located inside)
9)Bending range:0-125 degree
10) Depth of throat:1000 mm(Max. working width of material in clamp)
11) Hinge:5 groups
9) Total power:9.42KW (7.5KW+1.1KW+0.82KW)
10)Outline dimension(Length×Width×Height):5800×1700×1500 (For reference only)
Slitting Device
1) Type Of Blade : Slitting wheel
Diameter:80 (Enough)
Material:Cr12MoV
2) Drive system:Motor driving, 1.1KW
Guiding device:Steel rope circling
3) Slitting speed:Approx.0.8m/s
Slitting distance: Through steel rope circulation.
Bending & Slitting Device
1) Max. Bending thickness 1.0mm
2) Max. Bending length 6000mm
3) Max. Slit thickness 1.0mm
4) Min. folding dimension TBC
Hydraulic power pack
1)Capability:Max.16MPA
2)Capacity of oil tank: 170L
3)Power source:Hydraulic
PLC Control System
1)System:Siemens PLC Control
2)Numerical control locating system:Siemens PLC Control
3)Operating table:Touch Screen
4)Angle programmer:Encoder test
5)Slitting control:Manual
6)Emergency stop: e-stop button+ e-limit+ foot switch (right heavily)
Slitting wheels on folding machine
After-Sale Service
In correct operation & maintaining, the machine is guaranteed for one year since leaving our factory excludes the electric elements.
Installation:
If installation is needed, WE will dispatch a technician to the buyer's factory abroad to assist regulating the machine with charge free.
The buyer should assist US to get the Chinese technician's visa and should pay for the roundtrip air ticket and the local accommodation.
If installation is needed, the buyer shall make the following preparation before arrival of technicians.
Terms Of Trade
Package & Shipment: Facility water-proof packing, Control cabinet packed in wooden packing.Payment: 30%payment by T/T is required as deposit within a week since the contract signing date.70% payment by T/T is required before
the machine be send out of factory.