- Overview
- Product Description
- Detailed Photos
- Product Parameters
- Packaging & Shipping
- Installation Instructions
- After Sales Service
- Company Profile
Basic Info.
Packaging & Delivery
Product Description
1. The machine employs hydraulically-driven swing beam, the steel plate welded structure, and accumulator -based pullback cylinder with steady and reliable operation.
2.Indicator-based adjustment of gap of blade is convenient and fast.
3. The machine is equipped with lighting alignment device, and uses stepless control for the stroke of up tool carrier.
4.The machine uses protection fence for safe operation.
5.Digital display device for size of back gauge and shearing times available.
Hydraulic Swing Beam Shearing Machine | 6X2500 | 6X3200 | 6X4000 | 6X6000 |
Cutting Thickness (mm) | 6 | 6 | 6 | 6 |
Cutting Width (mm) | 2500 | 3200 | 4000 | 6000 |
Throat Depth (mm) | 100 | 100 | 100 | 100 |
Cutting Angle (o) | 1.5 | 1.5 | 1.5 | 1.5 |
Backgauge Range (mm) | 20-600 | 20-600 | 20-600 | 20-800 |
Stroke Number (times/min) | ≥12 | ≥11 | ≥9 | ≥5 |
Main Motor (kw) | 7.5 | 7.5 | 7.5 | 7.5 |
Weight (kg) | 4800 | 6000 | 8200 | 16500 |
Overall Dimensions (LxWxH in mm) | 3150X1700X1650 | 3850X1700X1650 | 4650X1850X1700 | 6780X2100X2300 |
Equipment Installation and Debugging:
1. The supplier shall provide the purchaser with technical services such as the basic diagram of the equipment, schematic diagrams of water, electricity, gas and installation requirements within 10 days after signing the contract.
2. After the equipment is assembled in the supplier's factory, promptly notify the purchaser to send personnel to the supplier's site for pre-acceptance; and promptly notify the purchaser to make preparations for the installation and commissioning of the equipment at the purchaser's site.
3. The supplier provides free installation and commissioning services of the machine, and the buyer provides the necessary auxiliary facilities such as machine hoisting equipment and scaffolding and several auxiliary workers.
4. After the equipment is installed and debugged at the buyer's site, the final acceptance of the equipment is carried out.
Personnel training:
1. The supplier assigns professional and technical personnel to provide technical training for the buyer's operators free of charge.
2. The first stage: During the installation and commissioning period, at the user site, combined with the commissioning, use and programming of the equipment, the operators, maintenance personnel and technicians will be trained for 2 days, so that the relevant personnel of the user's operation have the ability to use the equipment proficiently. ability.
3. The second stage: After three months of normal operation of the equipment, if the demander needs it, the supplier can improve the training of maintenance personnel, operators and technicians again, so that the relevant personnel have the ability to troubleshoot and maintain the equipment, and improve their performance. Operating and programming skills.
Equipment warranty period and after-sales service:
2. The supplier promises to repair, maintain, service and guide the buyer free of charge during the warranty period; the supplier will unconditionally replace or repair the parts damaged due to equipment quality problems (except for accidental damage caused by the buyer's violation of the operating rules). ).
3. If the equipment fails, the supplier will respond quickly to the equipment repair report within 8 hours, and provide the supplier with 48-hour on-site maintenance services, free and timely troubleshooting, and free replacement of non-artificial damage or non-working parts.
4. All replacement parts/materials are original standard production parts/materials.